Login
Canadian Canoes Photo Gallery FROM THE SHOP TO THE WATER The Florida ZEPHYR
Advanced Search
Mount with WebDAV RSS Feed for this Album View Slideshow View Slideshow (Fullscreen)

FROM THE SHOP TO THE WATER

1. Matteos NOMAD 2. Dan's 15'... 3. Al Hanson's... 4. Derrick... 5. The Florida... 6. Jerry... 7. Peter and... 8. Bob Dorey's... ... 52. Barry...

Random Image

aap

aap

Date: 03/19/2005 Views: 1259

The Florida ZEPHYR

Date: 03/25/2005
Size: 95 items
nextlast
aae

aae

The white oak TRANSOM is a big section of wood and was made of three pieces joined together with wooden "biscuits" and polyurethane glue.

Date: 03/19/2005
Views: 2529
aaa

aaa

The setting up of the STATION MOLDS,once the STRONGBACK has been levelled, takes two people and most of a day.

Date: 03/19/2005
Views: 2040
aab

aab

With all the molds now in place,it was time to begin fabricating parts.

Date: 03/19/2005
Views: 1945
aac

aac

Seen from the side, all the molds are visible as well as the transom backer which will hold theTRANSOM at an angle of 14 degees.

Date: 03/22/2005
Views: 1888
aad

aad

The STEM SET had been bent some time ago, so it was clamped in place and the KEELSON (an inner keel) was scarf jointed with the inner stem.

Date: 03/22/2005
Views: 1912
aaf

aaf

We use an accurate CNC cut transom template to give us the most accurate transom we can produce. The first step is to cut out the basic shape just 1/8" larger than the template.

Date: 03/24/2005
Views: 1813
aag

aag

Then, a trimming router bit with an upper bearing (which follows the template) is used to cut out the final shape.

Date: 03/24/2005
Views: 1857
aah

aah

Finally, a large diameter rabbeting bit is used to make a channel in the inner face. This rabbet is the place where the strips will be attached but hidden where they meet the transom.

Date: 03/24/2005
Views: 1904
aaj

aaj

the BOW STEM is shaped (or 'faired' in boat talk). This process creates a flat landing place for the strips at the bow end.

Date: 03/24/2005
Views: 1762
aai

aai

The molds with the 3 foundation pieces is ready to receive the bead and cove strips after...

Date: 03/24/2005
Views: 1826
aak

aak

The strips are 3/8" x 1 1/4" and can only be held in place with small drywall screws. To prevent the screws from drawing into the wood-making an ugly bruise- we tempoorarily employ these thin PVC plastic strips which protect the wood as the stri

Date: 03/24/2005
Views: 1898
aal

aal

Now, in late March, the first 10 rows are now secured in place. With a curved inner shape to the transom area, these rows require a lot of "coaxing" to rotate in place.

Date: 03/28/2005
Views: 1928
aam

aam

The side view with the ten rows showing.

Date: 03/28/2005
Views: 1789
aan

aan

Now in early April,the stripping of the Zephyr continues with the colour pattern of the cedar being quite evident.

Date: 03/31/2005
Views: 1948
aao

aao

This area at the curve of the bilge is the most difficult part as there is a lot of twisting in each strip and the effort to get them in place is significant.

Date: 03/31/2005
Views: 1883
aap

aap

The real tough-to-bend strips are now in place as we approach the midline of the boat.

Date: 04/04/2005
Views: 1812
aaq

aaq

At the midline, the strips cannot get past one another as they could earlier. So, we have place a "stopper stick" along the midline and will plank up to that line until the one side is covered in with wood.

Date: 04/04/2005
Views: 1868
aar

aar

Today was a long session as we worked to close one side over and up to the midline.

Date: 04/05/2005
Views: 2017
nextlast
Page: 1 2 3 4 5 6
Powered by Gallery v2.3