|
aae
The white oak TRANSOM is a big section of wood and was made of three pieces joined together with wooden "biscuits" and polyurethane glue.
Date: 03/19/2005
Views: 2529
|
aaa
The setting up of the STATION MOLDS,once the STRONGBACK has been levelled, takes two people and most of a day.
Date: 03/19/2005
Views: 2040
|
aab
With all the molds now in place,it was time to begin fabricating parts.
Date: 03/19/2005
Views: 1945
|
|
aac
Seen from the side, all the molds are visible as well as the transom backer which will hold theTRANSOM at an angle of 14 degees.
Date: 03/22/2005
Views: 1888
|
aad
The STEM SET had been bent some time ago, so it was clamped in place and the KEELSON (an inner keel) was scarf jointed with the inner stem.
Date: 03/22/2005
Views: 1912
|
aaf
We use an accurate CNC cut transom template to give us the most accurate transom we can produce. The first step is to cut out the basic shape just 1/8" larger than the template.
Date: 03/24/2005
Views: 1813
|
|
aag
Then, a trimming router bit with an upper bearing (which follows the template) is used to cut out the final shape.
Date: 03/24/2005
Views: 1857
|
aah
Finally, a large diameter rabbeting bit is used to make a channel in the inner face. This rabbet is the place where the strips will be attached but hidden where they meet the transom.
Date: 03/24/2005
Views: 1904
|
aaj
the BOW STEM is shaped (or 'faired' in boat talk). This process creates a flat landing place for the strips at the bow end.
Date: 03/24/2005
Views: 1762
|
|
aai
The molds with the 3 foundation pieces is ready to receive the bead and cove strips after...
Date: 03/24/2005
Views: 1826
|
aak
The strips are 3/8" x 1 1/4" and can only be held in place with small drywall screws. To prevent the screws from drawing into the wood-making an ugly bruise- we tempoorarily employ these thin PVC plastic strips which protect the wood as the stri
Date: 03/24/2005
Views: 1898
|
aal
Now, in late March, the first 10 rows are now secured in place. With a curved inner shape to the transom area, these rows require a lot of "coaxing" to rotate in place.
Date: 03/28/2005
Views: 1928
|
|
aam
The side view with the ten rows showing.
Date: 03/28/2005
Views: 1789
|
aan
Now in early April,the stripping of the Zephyr continues with the colour pattern of the cedar being quite evident.
Date: 03/31/2005
Views: 1948
|
aao
This area at the curve of the bilge is the most difficult part as there is a lot of twisting in each strip and the effort to get them in place is significant.
Date: 03/31/2005
Views: 1883
|
|
aap
The real tough-to-bend strips are now in place as we approach the midline of the boat.
Date: 04/04/2005
Views: 1812
|
aaq
At the midline, the strips cannot get past one another as they could earlier. So, we have place a "stopper stick" along the midline and will plank up to that line until the one side is covered in with wood.
Date: 04/04/2005
Views: 1868
|
aar
Today was a long session as we worked to close one side over and up to the midline.
Date: 04/05/2005
Views: 2017
|