|
aaa
It has been many months since someone has built an asymmetrical canoe so, Jurek set about organizing the station molds for this April 2004 project.
Date: 04/12/2004
Views: 1665
|
aab
After lots of emphasis from Ron about the midline, I set about adding a midline and fairing lines to both stems.
Date: 04/13/2004
Views: 1289
|
aac
Wwe took a bit of time ensuring that the stems were well centered on the stem stations before we could begin fairing them.
Date: 04/13/2004
Views: 1285
|
|
aad
DSCN7697
Date: 04/13/2004
Views: 1283
|
aae
DSCN7710
Date: 04/14/2004
Views: 1354
|
aaf
DSCN7713
Date: 04/14/2004
Views: 1287
|
|
aag
DSCN7715
Date: 04/14/2004
Views: 1314
|
aah
DSCN7721
Date: 04/14/2004
Views: 1207
|
aai
Gluing banding into a strip to create an accent. I first routed a 1/4 inch groove into the strip, then glued the banding in while matching the pattern.
Date: 04/17/2004
Views: 1363
|
|
aaj
With lighter strips on either side of the accent strip, it looks great. We will see if I still feel that way when it comes to spoke shaving and sanding.
Date: 04/21/2004
Views: 1365
|
aak
DSCN7804
Date: 04/21/2004
Views: 1264
|
aal
Having my dad to help put on the long strips has made things much easier.
Date: 04/21/2004
Views: 1216
|
|
aam
So far, the stripping has been fairly easy. We are starting to approach the compound bends soon though.
Date: 04/21/2004
Views: 1233
|
aan
Progress has been slow getting around the waterline with the narrow twists at the stem and stern. The lines are starting to straighten out now, and the canoe is starting to take shape!
Date: 04/24/2004
Views: 1296
|
aao
DSCN7854
Date: 04/24/2004
Views: 1275
|
|
aap
DSCN7885
Date: 04/26/2004
Views: 1229
|
aaq
DSCN7888
Date: 04/27/2004
Views: 1258
|
aar
For some reason it is very satisfying to see a nice true center line trimmed
Date: 04/27/2004
Views: 1242
|