This is how Gary's project started to take shape. George Okon and Ron Frenette spent a long evening getting the strongback and station molds all set for building.
Viewed: 882 times.
|
After all the molds are in place, the edges are waxed and temporary stabilizers are nailed to each station mold.
Viewed: 789 times.
|
And, as with all the projects, Gary began by laying out some fairing lines on the inner stems.
Viewed: 764 times.
|
DSC 4210
Viewed: 722 times.
|
DSC 4220
Viewed: 732 times.
|
DSC 4266
Viewed: 724 times.
|
DSC 4280
Viewed: 756 times.
|
DSC 4405
Viewed: 750 times.
|
DSC 4419
Viewed: 708 times.
|
DSC 4424
Viewed: 703 times.
|
DSC 4429
Viewed: 726 times.
|
DSC 4439
Viewed: 710 times.
|
DSC 4444
Viewed: 724 times.
|
DSC 4448
Viewed: 730 times.
|
DSC 4455
Viewed: 687 times.
|
DSC 4512
Viewed: 639 times.
|
DSC 4559
Viewed: 706 times.
|
DSC 4561
Viewed: 764 times.
|