Peter Feindel's 17' kayak ENDEAVOUR 
January 14/04...along with brother David, this is the beginning of a project about which I have been thinking for a long time. Installing the very first parts-the sheer clamps.
January 14/04...along with brother David, this is the beginning of a project about which I have been thinking for a long time. Installing the very first parts-the sheer clamps.
Viewed: 748 times.

Fastening sheer clamps in place
Fastening sheer clamps in place
Viewed: 709 times.

Determining center line and fairing lines.
Determining center line and fairing lines.
Viewed: 645 times.

A little spoke shaving soon fairs the bow and stern posts up to the curvature.
A little spoke shaving soon fairs the bow and stern posts up to the curvature.
Viewed: 695 times.

Peter-sore fingers and all- checks the fairing angle with a batten.
Peter-sore fingers and all- checks the fairing angle with a batten.
Viewed: 613 times.

This shows the progress, 7 strips on each side. The wet spots left from damp-wiping excess glue show the beauty of the wood.
This shows the progress, 7 strips on each side. The wet spots left from damp-wiping excess glue show the beauty of the wood.
Viewed: 614 times.

Fairing the stern stem.
Fairing the stern stem.
Viewed: 627 times.

Peter wipes off excess glue from the inside as well to save time and effort later on.
Peter wipes off excess glue from the inside as well to save time and effort later on.
Viewed: 618 times.

A nice long shot with the accent strips clearly showing.
A nice long shot with the accent strips clearly showing.
Viewed: 623 times.

still wiping excess as rows added
still wiping excess as rows added
Viewed: 609 times.

Mid January and already dreaming about paddling this kayak.
Mid January and already dreaming about paddling this kayak.
Viewed: 597 times.

Cleaning up for the days.  9 rows completed.
Cleaning up for the days. 9 rows completed.

Viewed: 606 times.

- David gets a head start on Peter, working the strips up to the top of the stem after finishing the fairing of the bow and stern posts.
- David gets a head start on Peter, working the strips up to the top of the stem after finishing the fairing of the bow and stern posts.
Viewed: 601 times.

 Peter arrives in time to help close in the first side.
Peter arrives in time to help close in the first side.
Viewed: 601 times.

note the small squares used to hold the strips in place where staples did not have enough holding power.
note the small squares used to hold the strips in place where staples did not have enough holding power.

Viewed: 589 times.

Peter carefully marks and measures for the length of the next strip.
Peter carefully marks and measures for the length of the next strip.

Viewed: 630 times.

Jurek shows Peter how to mark the centerline in preparation for cutting off the waste.
Jurek shows Peter how to mark the centerline in preparation for cutting off the waste.

Viewed: 594 times.

The first side is trimmed to the centerline using a sharp chisel and lots of care.
The first side is trimmed to the centerline using a sharp chisel and lots of care.

Viewed: 599 times.

Powered by Gallery v1 RSS