January 14/04...along with brother David, this is the beginning of a project about which I have been thinking for a long time. Installing the very first parts-the sheer clamps.
Viewed: 748 times.
|
Fastening sheer clamps in place
Viewed: 709 times.
|
Determining center line and fairing lines.
Viewed: 645 times.
|
A little spoke shaving soon fairs the bow and stern posts up to the curvature.
Viewed: 695 times.
|
Peter-sore fingers and all- checks the fairing angle with a batten.
Viewed: 613 times.
|
This shows the progress, 7 strips on each side. The wet spots left from damp-wiping excess glue show the beauty of the wood.
Viewed: 614 times.
|
Fairing the stern stem.
Viewed: 627 times.
|
Peter wipes off excess glue from the inside as well to save time and effort later on.
Viewed: 618 times.
|
A nice long shot with the accent strips clearly showing.
Viewed: 623 times.
|
still wiping excess as rows added
Viewed: 609 times.
|
Mid January and already dreaming about paddling this kayak.
Viewed: 597 times.
|
Cleaning up for the days. 9 rows completed.
Viewed: 606 times.
|
- David gets a head start on Peter, working the strips up to the top of the stem after finishing the fairing of the bow and stern posts.
Viewed: 601 times.
|
Peter arrives in time to help close in the first side.
Viewed: 601 times.
|
note the small squares used to hold the strips in place where staples did not have enough holding power.
Viewed: 589 times.
|
Peter carefully marks and measures for the length of the next strip.
Viewed: 630 times.
|
Jurek shows Peter how to mark the centerline in preparation for cutting off the waste.
Viewed: 594 times.
|
The first side is trimmed to the centerline using a sharp chisel and lots of care.
Viewed: 599 times.
|