Bill Rubenstein's 14' 6" SWITZER  
The fore and aft decks have now been all built and sanded; this is just before setting up to add cloth and resin to these surfaces also.

The fore and aft decks have now been all built and sanded; this is just before setting up to add cloth and resin to these surfaces also.


Powered by Gallery v1 RSS